SoC Integration Checklist
Use this checklist as a quick route through the integration work; each item links to its detailed requirements elsewhere in this guide. Record minimum evidence against each gate before sign-off.
1. Integration gates
| Done | Integration gate | Minimum evidence | Reference |
|---|---|---|---|
[ ] |
Select the delivered hierarchy, enabled subsystems, and required configuration |
Selected hierarchy and configuration record reviewed |
|
[ ] |
Assign the chiplet address envelope and program the SEP and SMC apertures |
Approved non-overlapping address map; aperture CSRs verified in simulation |
|
[ ] |
Connect clocks, resets, power-good, and configuration straps; follow the power-up sequence |
Clock/reset/power review and sequencing test pass |
|
[ ] |
Connect external pin, bus, memory, eFuse, peripheral, and debug interfaces |
Interface connectivity and tie-off audit complete |
|
[ ] |
Verify boot and reset progression, including fuse sensing, memory repair or bypass, ROM execution, and SEP release when enabled |
Successful boot and reset log including failure paths |
|
[ ] |
Apply technology-mapping and CDC constraints; run integration-level verification |
Lint, CDC/RDC, constraint, and integration-test reports archived |
Prim Cell Replacement, CDC Timing Constraints, Why Open Chiplet Atlas Harness |
[ ] |
For each adopter-owned IP, select its trust and attachment class and complete the User IP integration checklist |
User IP integration checklist completed per IP block |
User IP integration checklist (see the User IP Integration chapter) |