Linking reports
TT-NN Visualizer can attempt to link the current active memory and performance reports to provide additional data insights. This is only possible when the two reports are from the same run.
The current link status is indicated in the UI when both a memory and performance report are loaded. If reports fail to link it is likely they are not from the same run.
Successful link
Failed link
Allocation failures in the performance view
When the linked memory report records allocation failures, the performance table lists them in a callout above it. See Allocation failures, under “In the performance view”.